How we estimate battery returns
AvenX's October 2026 model estimates a 15-year project return of 14.7% for a typical grid-scale battery in Germany, 10.6% in the Netherlands and 15.9% in Poland; these are illustrations, not a forecast.* This page shows how we calculate them from published market data and research, so you can check every step.3,12,15
The reference battery
Where the earnings come from
A battery earns in three ways: from reserve markets, which pay batteries to stand by and keep the grid stable (FCR and aFRR); from trading electricity on wholesale markets; and in Germany and Poland also from a capacity market.
The model starts from what batteries earn today and lowers reserve income as more batteries compete for the same markets.6,18,19,20,15 A 4-hour battery can trade more energy than the 2-hour batteries most market data describes; the model assumes 1.5 times the trading income.21,22
How the return is calculated
For every year the model takes the earnings and subtracts the trading partner fee, maintenance and grid fees. What remains is the net cash flow.
The project return (internal rate of return, IRR) is the yearly rate at which these 15 years of net cash flow exactly pay back the investment made before the battery starts.
Net cash flow = earnings − trading partner fee − maintenance − grid fees
Results per country
| Germany | Netherlands | Poland | |
|---|---|---|---|
| Earnings in 2027 (per MW) | €245,000 | €352,320 | €350,000 |
| Earnings over 15 years (per MW) | €2,786,856 | €3,530,057 | €2,939,240 |
| Grid fees over 15 years (per MW) | €0 | €1,219,186 | €172,934 |
| Years until the investment is paid back | 6 years | 7 years | 6 years |
| Project return (IRR) | 14.7% | 10.6% | 15.9% |
What drives the result
Germany: batteries connected before 4 August 2029 pay no grid fees for 20 years,23 and a capacity market is expected from 2031.3 The main cost risk is a grid connection levy (BKZ) that network operators may now charge batteries.24
Battery storage returns in GermanyNetherlands: the highest trading income, but also the highest grid fees. TenneT charges batteries for transport capacity, partly offset by discounts for flexible use.12 Reserve income has already fallen sharply,25 and the result depends strongly on how much trading value a battery captures.20,26
Battery storage returns in the NetherlandsPoland: today's earnings are exceptional, about half of them from the aFRR reserve market,15 but that market buys only 400–500 MW while about 5 GW of batteries are on the way.14,27 The model therefore lowers reserve income steeply by 2030. Grid fees are charged only on energy lost,28 and a small capacity payment starts in 2030.29,13,30
Battery storage returns in Poland
What if the assumptions are wrong?
Earnings are the most uncertain input. The table shows the project return if earnings or the investment differ by 20% from the base case.17,16
| Scenario | Germany | Netherlands | Poland |
|---|---|---|---|
| Base case | 14.7% | 10.6% | 15.9% |
| Earnings 20% lower | 9.4% | 1.2% | 9.5% |
| Earnings 20% higher | 19.6% | 18.3% | 21.9% |
| Investment 20% higher | 10.8% | 6.7% | 11.5% |
| Investment 20% lower | 20.1% | 16.3% | 22.3% |
View the yearly cash flows (€ thousand per MW)
| Year | Germany | Netherlands | Poland |
|---|---|---|---|
| 2026 (Investment) | -935 | -935 | -935 |
| 2027 | 201.8 | 227.9 | 286.3 |
| 2028 | 181.0 | 180.0 | 199.6 |
| 2029 | 159.2 | 146.5 | 150.7 |
| 2030 | 145.3 | 122.6 | 145.1 |
| 2031 | 153.0 | 116.5 | 141.4 |
| 2032 | 149.4 | 110.5 | 137.9 |
| 2033 | 146.0 | 104.6 | 134.3 |
| 2034 | 142.6 | 98.6 | 130.9 |
| 2035 | 139.2 | 92.7 | 127.4 |
| 2036 | 135.9 | 86.9 | 124.1 |
| 2037 | 132.6 | 81.1 | 120.7 |
| 2038 | 129.4 | 75.3 | 117.5 |
| 2039 | 126.3 | 69.5 | 114.2 |
| 2040 | 123.1 | 63.8 | 111.0 |
| 2041 | 120.1 | 58.1 | 107.9 |
What the model leaves out
The model does not include corporate tax, debt financing, inflation-linked earnings, any value after year 15, battery replacements or Polish subsidies. A project return is also not the return an investor receives: that also depends on fees, the price paid for earnings shares and personal taxes.
Sources
- 2.DNV. Financing energy transition: Building bankable battery projects (opens in a new tab), 2026
- 3.Modo Energy. German BESS investment outlook: Executive summary (opens in a new tab), 16 Mar 2026
- 5.howtostoreelectricity.com. BESS profitability by country 2026 (opens in a new tab), 22 May 2026
- 6.Enspired. Monthly BESS revenues and market trends, Q2 2026 (opens in a new tab), 2026
- 8.Ember. How cheap is battery storage? (opens in a new tab), 11 Dec 2025
- 12.Modo Energy. The Netherlands has some of Europe's best market fundamentals for BESS: why is it lagging? (opens in a new tab), 10 Aug 2026
- 13.Modo Energy. Poland's BESS investment case is shifting from capacity-backed to merchant-led (opens in a new tab), 20 Mar 2026
- 14.Modo Energy. aFRR in Poland: how Poland's automatic frequency reserve market works (opens in a new tab), 24 Jul 2026
- 15.Modo Energy. Polish BESS revenues rose to 1.89m PLN/MW/yr in August 2026 (opens in a new tab), 4 Sept 2026
- 16.Modo Energy. 2026 Capex Survey (opens in a new tab), 9 Sept 2026
- 17.BESS-Market. CAPEX Benchmark: What does a BESS project cost in 2026? (opens in a new tab), 25 Aug 2026
- 18.Enspired. Monthly BESS revenues and market trends, Q3 2026 (opens in a new tab), 2026
- 19.enervis via ESS News. Enervis Battery Storage Index: December revenues fall to multi-month low (opens in a new tab), Jan 2026
- 20.KYOS. Battery Revenues Report No. 9 (opens in a new tab), Aug 2025
- 21.Voltcast. Battery revenue in Netherlands – daily BESS index (opens in a new tab), Jun 2026
- 22.Modo Energy. What's the optimal battery duration in Germany? (opens in a new tab), 1 Dec 2025
- 23.Herbert Smith Freehills Kramer. German grid fee reform for BESS: BNetzA preserves grandfathering (opens in a new tab), 12 Jun 2026
- 24.dvlp.energy. Construction cost levy (BKZ) in 2026: overview of changes (opens in a new tab), 6 Feb 2026
- 25.Modo Energy. Netherlands BESS, capacity market, TenneT aFRR (2026) (opens in a new tab), 20 Aug 2026
- 26.Solarplaza. The realities of Dutch BESS revenues (opens in a new tab), 3 Jun 2026
- 27.Modo Energy. Poland battery pipeline, buildout queue, capacity market (2026) (opens in a new tab), 4 Apr 2026
- 28.Modo Energy. Poland grid fees for BESS (opens in a new tab), 9 Sept 2026
- 29.ESS News. Poland downgrades BESS availability, plummets total awards in capacity market auction (opens in a new tab), Dec 2025
- 30.30rates.com. EUR to PLN today (opens in a new tab), 13 Oct 2026